Line 144: | Line 144: | ||
<img src="https://static.igem.org/mediawiki/2019/f/fc/T--XMU-China--home%282%29.png"> | <img src="https://static.igem.org/mediawiki/2019/f/fc/T--XMU-China--home%282%29.png"> | ||
<div>MODEL</div> | <div>MODEL</div> | ||
− | <p> | + | <p>We utilized Process Control in Engineering<br> |
− | to systematically | + | to systematically analyze the process<br> |
− | from inducer to protein and | + | from inducer to protein and divide the <br> |
process into four modules. Meanwhile, <br> | process into four modules. Meanwhile, <br> | ||
− | + | we established an ODE model of co-culture <br> | |
− | + | under the situation of Spite.<br> | |
</p> | </p> |
Revision as of 13:45, 17 November 2019