Team:Nanjing-China/Hardware

Team:Nanjing-China




Planform

A:Electrical control element

B:Core phosphorus removal chamber

C:Clear water basin(The equipment room is under the clear water basin)

D:Desilter

E:Dosing chamber

F:Phosphorous releasing room (not necessarily available, experimental exploration is required)

Front View

Left View




The back of the front view

A:Electrical control element

B:Core phosphorus removal chamber

C:Clear water basin(The equipment room is under the clear water basin)

D:Desilter

E:Dosing chamber

F:Phosphorous releasing room (not necessarily available, experimental exploration is required)

Core phosphorus removal chamber

The overflow hole

Floating ball valve

Aerator pipe

Straws

The MBR membrane