Hardware
Planform
A:Electrical control element
B:Core phosphorus removal chamber
C:Clear water basin(The equipment room is under the clear water basin)
D:Desilter
E:Dosing chamber
F:Phosphorous releasing room (not necessarily available, experimental exploration is required)
![](https://static.igem.org/mediawiki/2019/8/80/T--Nanjing-China--hardware1.png)
Front View
![](https://static.igem.org/mediawiki/2019/d/d4/T--Nanjing-China--hardware2.png)
Left View
![](https://static.igem.org/mediawiki/2019/2/26/T--Nanjing-China--hardware3.png)
![](https://static.igem.org/mediawiki/2019/0/05/T--Nanjing-China--hardware4.png)
The back of the front view
A:Electrical control element
B:Core phosphorus removal chamber
C:Clear water basin(The equipment room is under the clear water basin)
D:Desilter
E:Dosing chamber
F:Phosphorous releasing room (not necessarily available, experimental exploration is required)
![](https://static.igem.org/mediawiki/2019/0/09/T--Nanjing-China--backtotop.jpg)