Revision as of 05:55, 17 October 2019

Team:Nanjing-China




Planform

A:Electrical control element

B:Core phosphorus removal chamber

C:Clear water basin(The equipment room is under the clear water basin)

D:Desilter

E:Dosing chamber

F:Phosphorous releasing room (not necessarily available, experimental exploration is required)

Front View

Left View




The back of the front view

A:Electrical control element

B:Core phosphorus removal chamber

C:Clear water basin(The equipment room is under the clear water basin)

D:Desilter

E:Dosing chamber

F:Phosphorous releasing room (not necessarily available, experimental exploration is required)

Core phosphorus removal chamber



The overflow hole

Floating ball valve

Aerator pipe

Straws

The MBR membrane







Phosphorus wastewater will enter the chamber by gravity overflow, and the side is connected with two float valves with two water levels of high and low. On a normal basis, the water level is between the two float valves. If water level is too low, then low water level float valve falls( As shown in the photo, no water is added and the valve is in the state of fallen), and the low-water light on display panel will light up . On the other hand, if water level is too high, then high water level float valve floats and the high-water level light on display panel will be on. We can monitor the water level according to the panel.