Difference between revisions of "Team:Nanjing-China/Hardware"

Line 220: Line 220:
 
                     <div class="service-block">
 
                     <div class="service-block">
 
                         <!-- service block -->
 
                         <!-- service block -->
<img src="https://static.igem.org/mediawiki/2019/7/78/T--Nanjing-China--hardware6.png" class="aligncenter img-responsive" style="height:114%;">
+
<img src="https://static.igem.org/mediawiki/2019/7/78/T--Nanjing-China--hardware6.png" class="aligncenter img-responsive" style="height:72.5%;">
 
                     </div>
 
                     </div>
 
                     <!-- /.service block -->
 
                     <!-- /.service block -->

Revision as of 15:15, 16 October 2019

Team:Nanjing-China




Planform

A:Electrical control element

B:Core phosphorus removal chamber

C:Clear water basin(The equipment room is under the clear water basin)

D:Desilter

E:Dosing chamber

F:Phosphorous releasing room (not necessarily available, experimental exploration is required)

Front View

Left View




The back of the front view

A:Electrical control element

B:Core phosphorus removal chamber

C:Clear water basin(The equipment room is under the clear water basin)

D:Desilter

E:Dosing chamber

F:Phosphorous releasing room (not necessarily available, experimental exploration is required)

Core phosphorus removal chamber

The overflow hole

Floating ball valve

Aerator pipe

Straws

The MBR membrane