Line 220: | Line 220: | ||
<div class="service-block"> | <div class="service-block"> | ||
<!-- service block --> | <!-- service block --> | ||
− | <img src="https://static.igem.org/mediawiki/2019/7/78/T--Nanjing-China--hardware6.png" class="aligncenter img-responsive"> | + | <img src="https://static.igem.org/mediawiki/2019/7/78/T--Nanjing-China--hardware6.png" class="aligncenter img-responsive" style="height:114%;"> |
</div> | </div> | ||
<!-- /.service block --> | <!-- /.service block --> | ||
Line 234: | Line 234: | ||
<div class="service-block"> | <div class="service-block"> | ||
<!-- service block --> | <!-- service block --> | ||
− | <img src="https://static.igem.org/mediawiki/2019/e/e7/T--Nanjing-China--hardware8.png" class="aligncenter img-responsive"> | + | <img src="https://static.igem.org/mediawiki/2019/e/e7/T--Nanjing-China--hardware8.png" class="aligncenter img-responsive" style="height:98.7%;"> |
</div> | </div> | ||
<!-- /.service block --> | <!-- /.service block --> |
Revision as of 15:05, 16 October 2019
Planform
A:Electrical control element
B:Core phosphorus removal chamber
C:Clear water basin(The equipment room is under the clear water basin)
D:Desilter
E:Dosing chamber
F:Phosphorous releasing room (not necessarily available, experimental exploration is required)
Front View
Left View
The back of the front view
A:Electrical control element
B:Core phosphorus removal chamber
C:Clear water basin(The equipment room is under the clear water basin)
D:Desilter
E:Dosing chamber
F:Phosphorous releasing room (not necessarily available, experimental exploration is required)
Core phosphorus removal chamber
The overflow hole
Floating ball valve
Aerator pipe
Straws
The MBR membrane