Difference between revisions of "Team:Nanjing-China/Hardware"

Line 212: Line 212:
 
<p style="font-size:20px!important;">Straws</p>
 
<p style="font-size:20px!important;">Straws</p>
 
<p style="font-size:20px!important;">The MBR membrane</p>
 
<p style="font-size:20px!important;">The MBR membrane</p>
    <img src="https://static.igem.org/mediawiki/2019/d/df/T--Nanjing-China--hardware5.png" class="aligncenter img-responsive" style="height:270px;">
+
    <img src="https://static.igem.org/mediawiki/2019/d/df/T--Nanjing-China--hardware5.png" class="aligncenter img-responsive" style="height:250px;">
 
</div>
 
</div>
 
                     </div>
 
                     </div>

Revision as of 15:21, 16 October 2019

Team:Nanjing-China




Planform

A:Electrical control element

B:Core phosphorus removal chamber

C:Clear water basin(The equipment room is under the clear water basin)

D:Desilter

E:Dosing chamber

F:Phosphorous releasing room (not necessarily available, experimental exploration is required)

Front View

Left View




The back of the front view

A:Electrical control element

B:Core phosphorus removal chamber

C:Clear water basin(The equipment room is under the clear water basin)

D:Desilter

E:Dosing chamber

F:Phosphorous releasing room (not necessarily available, experimental exploration is required)

Core phosphorus removal chamber

The overflow hole

Floating ball valve

Aerator pipe

Straws

The MBR membrane