Line 220: | Line 220: | ||
<div class="service-block"> | <div class="service-block"> | ||
<!-- service block --> | <!-- service block --> | ||
− | <img src="https://static.igem.org/mediawiki/2019/7/78/T--Nanjing-China--hardware6.png" class="aligncenter img-responsive" style="height: | + | <img src="https://static.igem.org/mediawiki/2019/7/78/T--Nanjing-China--hardware6.png" class="aligncenter img-responsive" style="height:72.5%;"> |
</div> | </div> | ||
<!-- /.service block --> | <!-- /.service block --> |
Revision as of 15:15, 16 October 2019
Hardware
Planform
A:Electrical control element
B:Core phosphorus removal chamber
C:Clear water basin(The equipment room is under the clear water basin)
D:Desilter
E:Dosing chamber
F:Phosphorous releasing room (not necessarily available, experimental exploration is required)
![](https://static.igem.org/mediawiki/2019/8/80/T--Nanjing-China--hardware1.png)
Front View
![](https://static.igem.org/mediawiki/2019/d/d4/T--Nanjing-China--hardware2.png)
Left View
![](https://static.igem.org/mediawiki/2019/2/26/T--Nanjing-China--hardware3.png)
![](https://static.igem.org/mediawiki/2019/0/05/T--Nanjing-China--hardware4.png)
The back of the front view
A:Electrical control element
B:Core phosphorus removal chamber
C:Clear water basin(The equipment room is under the clear water basin)
D:Desilter
E:Dosing chamber
F:Phosphorous releasing room (not necessarily available, experimental exploration is required)
Core phosphorus removal chamber
The overflow hole
Floating ball valve
Aerator pipe
Straws
The MBR membrane
![](https://static.igem.org/mediawiki/2019/d/df/T--Nanjing-China--hardware5.png)
![](https://static.igem.org/mediawiki/2019/7/78/T--Nanjing-China--hardware6.png)
![](https://static.igem.org/mediawiki/2019/b/bc/T--Nanjing-China--hardware7.png)
![](https://static.igem.org/mediawiki/2019/e/e7/T--Nanjing-China--hardware8.png)
![](https://static.igem.org/mediawiki/2019/0/09/T--Nanjing-China--backtotop.jpg)